Home | Public Area

Document Details - ContinMaint_Procedures_z39_83.pdf


Document Details
Share |
Name ContinMaint_Procedures_z39_83.pdf (151K)
Revision 1
Description This is a draft of the Continuous Maintenance Procedures document required as part of the formal request to ANSI to change from Periodic to Continuous Maintenance.
Document State Draft (A preliminary sketch, outline, or version.)
Group / Folder Z39.83 (NCIP) Standing Committee / Documents
Submitter By Robert Walsh on Thursday, 25 June 2009 01:58pm
Public URL http://www.niso.org/apps/group_public/document.php?document_id=2336&wg_abbrev=z3983maint

Referenced Items

Name Type Date

Move NCIP from Periodic Review to Continuous Maintenance

Open Date: 2009-08-21 18:00:00 America/New_York

Under Periodic Review, ANSI/NISO standards must be reaffirmed at least once during every 5-year period. Continuous Maintenance allows standards to be reviewed and revised more frequently and without the need for a formal ballot. However, under Continuous Maintenance, a thorough procedure for how changes will be proposed and adopted must be...

page=ballotrefitems&type=document
* Move NCIP from Periodic Review to Continuous Maintenance Ballot (Reference Document) 2009-08-29 No Access

Document Revisions
Name # State Submitter Date Action
1
Draft
Robert Walsh
2009-06-25
This doc
ContinMaint_Procedures_z39_83.pages.zip
0
Draft
Robert Walsh
2009-06-25
(private)